Project: 2197 Sichuan Ya’an Shaping Hydropower Station Project - Request for post-registration changes
Project 2197 Sichuan Ya’an Shaping Hydropower Station Project
PRC ref PRC-2197-001
Process track Issuance
DOE ERM CVS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 18 Jun 09 - 17 Jun 16
Assessment opinion Assessment opinion (315 KB)
Revised PDD Revised PDD (560 KB)   Revised PDD - track changes (739 KB)
Supplementary documents
Signed form Signed form (223 KB)
DOE clarification
VVS version VVS 2.0
Current status 05 Apr 13 - Approved
Effective approval date: 05 Apr 13
Historic statuses 07 Mar 13 - Request published