Project: 3775 Low Pressure Gas Recovery Project of Shandong Weifang Hongrun Petrochemical Auxiliary Co., Ltd., China - Request for post-registration changes
Project 3775 Low Pressure Gas Recovery Project of Shandong Weifang Hongrun Petrochemical Auxiliary Co., Ltd., China
PRC ref PRC-3775-001
Process track Prior approval
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 03 Mar 2011 - 01 Nov 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 03 Mar 11 - 02 Mar 21
Assessment opinion Assessment opinion (316 KB)
Revised PDD Revised PDD (676 KB)   Revised PDD - track changes (2897 KB)
Supplementary documents Appendix 1 - Calculation spreadsheet of the boiler efficiency with monitored data.xls (30 KB)
Appendix 2 - Statement Letter on measurement of boiler efficiency.pdf (208 KB)
Signed form Signed form (140 KB)
DOE clarification DOE clarification 1 - PRC-3775-001 Clarification.pdf (402 KB)
VVS version VVS 2.0
Current status 13 Jan 13 - Approved
Effective approval date: 11 Jan 13
Historic statuses 20 Nov 12 - Published
04 Dec 12 - Awaiting DOE clarifications
07 Dec 12 - DOE clarifications received
07 Dec 12 - Summary note being prepared
21 Dec 12 - Awaiting EB decision