Project:
3775 Low Pressure Gas Recovery Project of Shandong Weifang Hongrun Petrochemical Auxiliary Co., Ltd., China
- Request for post-registration changes
Project | 3775 Low Pressure Gas Recovery Project of Shandong Weifang Hongrun Petrochemical Auxiliary Co., Ltd., China |
---|---|
PRC ref | PRC-3775-001 |
Process track | Prior approval |
DOE | JQA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 03 Mar 11 - 02 Mar 21 |
Assessment opinion | Assessment opinion (316 KB) |
Revised PDD | Revised PDD (676 KB) Revised PDD - track changes (2897 KB) |
Supplementary documents |
Appendix 1 - Calculation spreadsheet of the boiler efficiency with monitored data.xls (30 KB)
Appendix 2 - Statement Letter on measurement of boiler efficiency.pdf (208 KB) |
Signed form | Signed form (140 KB) |
DOE clarification |
DOE clarification 1 - PRC-3775-001 Clarification.pdf (402 KB)
|
VVS version | VVS 2.0 |
Current status | 13 Jan 13 -
Approved
Effective approval date: 11 Jan 13
|
Historic statuses |
20 Nov 12 -
Published 04 Dec 12 - Awaiting DOE clarifications 07 Dec 12 - DOE clarifications received 07 Dec 12 - Summary note being prepared 21 Dec 12 - Awaiting EB decision |