Project: 3678 Xinjiang Aksu Tumuxiuke Hydropower Project - Request for post-registration changes
Project 3678 Xinjiang Aksu Tumuxiuke Hydropower Project
PRC ref PRC-3678-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 03 Nov 10 - 02 Nov 17
Assessment opinion Assessment opinion (436 KB)
Revised PDD Revised PDD (1286 KB)   Revised PDD - track changes (1321 KB)
Supplementary documents
Signed form Signed form (54 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Nov 12 - Approved
Effective approval date: 09 Nov 12
Historic statuses 11 Oct 12 - Request published