Project: 0490 Catalytic N2O destruction project in the tail gas of the Nitric Acid Plant of Abu Qir Fertilizer Co. - Request for post-registration changes
Project 0490 Catalytic N2O destruction project in the tail gas of the Nitric Acid Plant of Abu Qir Fertilizer Co.
PRC ref PRC-0490-004
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 15 Sep 2020 - 31 Dec 2020

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 15 Sep 20 - 14 Sep 27
Assessment opinion Assessment opinion (656 KB)
Revised PDD Revised PDD (701 KB)   Revised PDD - track changes (702 KB)
Supplementary documents
Signed form Signed form (249 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 11 Nov 21 - Approved
Effective approval date: 11 Nov 21
Historic statuses 13 Oct 21 - Request published