Project: 4664 Liuyuan Hydropower Project in Gansu Province - Request for post-registration changes
Project 4664 Liuyuan Hydropower Project in Gansu Province
PRC ref PRC-4664-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 26 Nov 11 - 25 Nov 18
Assessment opinion Assessment opinion (826 KB)
Revised PDD Revised PDD (760 KB)   Revised PDD - track changes (783 KB)
Supplementary documents
Signed form Signed form (164 KB)
DOE clarification
VVS version VVS 2.0
Current status 03 May 13 - Approved
Effective approval date: 03 May 13
Historic statuses 04 Apr 13 - Request published