Project: 4168 Jiutiaoling Small Hydropower Project, Gansu Province - Request for post-registration changes
Project 4168 Jiutiaoling Small Hydropower Project, Gansu Province
PRC ref PRC-4168-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 May 11 - 30 Apr 18
Assessment opinion Assessment opinion (1760 KB)
Revised PDD Revised PDD (404 KB)   Revised PDD - track changes (548 KB)
Supplementary documents
Signed form Signed form (150 KB)
DOE clarification
VVS version VVS 2.0
Current status 05 Mar 13 - Approved
Effective approval date: 05 Mar 13
Historic statuses 04 Feb 13 - Request published