Project:
10392 20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan
- Request for post-registration changes
Project | 10392 20 MW Solar Project in Sanwreej, Jodhpur, Rajasthan |
---|---|
PRC ref | PRC-10392-001 |
Process track | Issuance |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 01 Aug 18 - 31 Jul 25 |
Assessment opinion | Assessment opinion (345 KB) |
Revised PDD | Revised PDD (666 KB) Revised PDD - track changes (679 KB) |
Supplementary documents | |
Signed form | Signed form (124 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 12 Aug 21 -
Approved
Effective approval date: 12 Aug 21
|
Historic statuses |
14 Jul 21 -
Request published |