18:15 25 Apr 24
Project:
10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda
- Request for post-registration changes
Project | 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda |
---|---|
PRC ref | PRC-10186-001 |
Process track | Prior approval |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 28 Aug 15 - 27 Aug 22 |
Assessment opinion | Assessment opinion (102 KB) |
Revised PDD | Revised PDD (958 KB) Revised PDD - track changes (959 KB) |
Supplementary documents |
Appendix 1 - CPA_FVR.pdf (175 KB)
Appendix 2 - CPA Appendix 4_Emission Reductions for CPA2 V4.xlsx (14 KB) Appendix 3 - Uganda CPA-DD 2.pdf (797 KB) |
Signed form | Signed form (2312 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 16 Jun 17 -
Approved
Effective approval date: 15 Jun 17
|
Historic statuses |
15 May 17 -
Published 15 May 17 - Summary note being prepared 26 May 17 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: