Project: 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project - Request for post-registration changes
Project 0530 ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project
PRC ref PRC-0530-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Sep 09 - 31 Aug 16
Assessment opinion Assessment opinion (265 KB)
Revised PDD Revised PDD (1168 KB)   Revised PDD - track changes (1264 KB)
Supplementary documents
Signed form Signed form (162 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 03 Sep 13
Historic statuses 23 Jul 13 - Published
23 Jul 13 - Summary note being prepared
13 Aug 13 - Awaiting EB decision