Project: 1946 Ningxia Yinyi Hongsipu 49.50MW Wind-farm Project - Request for post-registration changes
Project 1946 Ningxia Yinyi Hongsipu 49.50MW Wind-farm Project
PRC ref PRC-1946-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 16 Nov 08 - 15 Nov 15
Assessment opinion Assessment opinion (289 KB)
Revised PDD Revised PDD (332 KB)   Revised PDD - track changes (333 KB)
Supplementary documents
Signed form Signed form (112 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Apr 13 - Approved
Effective approval date: 25 Apr 13
Historic statuses 27 Mar 13 - Request published