04:52 15 Oct 24
Project:
3983 Gansu Lintan Shubu Small Hydropower Station Project
- Request for post-registration changes
Project | 3983 Gansu Lintan Shubu Small Hydropower Station Project |
---|---|
PRC ref | PRC-3983-001 |
Process track | Prior approval |
DOE | CEPREI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 25 Dec 10 - 24 Dec 17 |
Assessment opinion | Assessment opinion (245 KB) |
Revised PDD | Revised PDD (639 KB) Revised PDD - track changes (667 KB) |
Supplementary documents | |
Signed form | Signed form (52 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 13 Jan 13 -
Approved
Effective approval date: 11 Jan 13
|
Historic statuses |
11 Dec 12 -
Published 11 Dec 12 - Summary note being prepared 21 Dec 12 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: