Project: 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa - Request for post-registration changes
Project 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa
PRC ref PRC-9007-003
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Include additional host Parties, Revisions to the eligibility criteria due to methodologies applied to the PoA are revised or replaced by the Board subsequent to being placed on hold
Applicable crediting period 25 Apr 13 - 24 Apr 20
Assessment opinion Assessment opinion (1137 KB)
Revised PDD Revised PDD (26 MB)   Revised PDD - track changes (26 MB)
Supplementary documents Appendix 1 - CQC_Zambia_fNRB_FAO_2015.xlsx (419 KB)
Appendix 2 - Host country approval- Zambia.pdf (561 KB)
Signed form Signed form (2242 KB)
DOE clarification DOE clarification 1 - 9007 PoA DD (27.12.18) clean.pdf (26 MB)
DOE clarification 2 - 9007 PoA DD (27.12.18) TC.pdf (26 MB)
DOE clarification 3 - Zambia_fNRB- Version 02.xlsx (578 KB)
DOE clarification 4 - CCIPL 630-PRC FVR-UNFCCC clarifcation- CLEAN.pdf (1193 KB)
DOE clarification 5 - CCIPL 630-PRC FVR-UNFCCC clarifcation- TC.pdf (1205 KB)
VVS version VVS-PoA 1.0
Current status 23 Jan 19 - Approved
Effective approval date: 22 Jan 19
Historic statuses 10 Dec 18 - Published
20 Dec 18 - Awaiting DOE clarifications
29 Dec 18 - DOE clarifications received
29 Dec 18 - Summary note being prepared
02 Jan 19 - Awaiting EB decision