Project: 2347 150 MW grid connected Wind Power based electricity generation project in Gujarat, India - Request for post-registration changes
Project 2347 150 MW grid connected Wind Power based electricity generation project in Gujarat, India
PRC ref PRC-2347-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 18 Jun 09 - 17 Jun 16
Assessment opinion Assessment opinion (507 KB)
Revised PDD Revised PDD (1934 KB)   Revised PDD - track changes (2257 KB)
Supplementary documents
Signed form Signed form (97 KB)
DOE clarification
VVS version VVS 2.0
Current status 18 Apr 13 - Approved
Effective approval date: 18 Apr 13
Historic statuses 20 Mar 13 - Request published