Project:
0164 Bandeirantes Landfill Gas to Energy Project (BLFGE)
- Request for post-registration changes
| Project | 0164 Bandeirantes Landfill Gas to Energy Project (BLFGE) |
|---|---|
| PRC ref | PRC-0164-001 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 23 Dec 17 - 22 Dec 24 |
| Assessment opinion |
Assessment opinion (202 KB)
|
| Revised PDD |
Revised PDD (858 KB)
Revised PDD - track changes (930 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (113 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 15 Apr 24 -
Approved
Effective approval date: 15 Apr 24
|
| Historic statuses |
15 Mar 24 -
Request published |

Assessment opinion