Project: 0606 El Canadá Hydroelectric Project - Request for post-registration changes
Project 0606 El Canadá Hydroelectric Project
PRC ref PRC-0606-001
Process track Issuance
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 23 Nov 10 - 22 Nov 17
Assessment opinion Assessment opinion (335 KB)
Revised PDD Revised PDD (1601 KB)   Revised PDD - track changes (1801 KB)
Supplementary documents
Signed form Signed form (259 KB)
DOE clarification
VVS version VVS 2.0
Current status 29 Jan 15 - Approved
Effective approval date: 29 Jan 15
Historic statuses 31 Dec 14 - Request published