13:31 26 Dec 24
Project:
0606 El Canadá Hydroelectric Project
- Request for post-registration changes
Project | 0606 El Canadá Hydroelectric Project |
---|---|
PRC ref | PRC-0606-001 |
Process track | Issuance |
DOE | AENOR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 23 Nov 10 - 22 Nov 17 |
Assessment opinion | Assessment opinion (335 KB) |
Revised PDD | Revised PDD (1601 KB) Revised PDD - track changes (1801 KB) |
Supplementary documents | |
Signed form | Signed form (259 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 29 Jan 15 -
Approved
Effective approval date: 29 Jan 15
|
Historic statuses |
31 Dec 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: