Project: 6307 Liki Pinangawan Muaralaboh Geothermal Power Plant - Request for post-registration changes
Project 6307 Liki Pinangawan Muaralaboh Geothermal Power Plant
PRC ref PRC-6307-001
Process track Issuance
DOE TÜV SÜD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 16 Dec 2019 - 31 Oct 2020

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 18 Sep 15 - 17 Sep 22
Assessment opinion Assessment opinion (314 KB)
Revised PDD Revised PDD (758 KB)   Revised PDD - track changes (852 KB)
Supplementary documents Appendix 1 - Emission Reduction sheet_80MW_V2_250121.xlsx (17 KB)
Appendix 2 - IRR Calculation Sheet_80MW_V2_200121.xlsx (65 KB)
Signed form Signed form (34 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 14 Apr 21 - Approved
Effective approval date: 14 Apr 21
Historic statuses 16 Mar 21 - Request published