Project: 1220 Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) Limited - Request for post-registration changes
Project 1220 Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) Limited
PRC ref PRC-1220-002
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 14 Dec 07 - 13 Dec 17
Assessment opinion Assessment opinion (731 KB)
Revised PDD Revised PDD (1159 KB)   Revised PDD - track changes (1162 KB)
Supplementary documents
Signed form Signed form (102 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Mar 15 - Approved
Effective approval date: 27 Mar 15
Historic statuses 26 Feb 15 - Request published