Project: 10004 City of Cape Town Landfill Gas Extraction and Utilisation Programme - Request for post-registration changes
Project 10004 City of Cape Town Landfill Gas Extraction and Utilisation Programme
PRC ref PRC-10004-003
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list ACM0001 ver. 19 - Flaring or use of landfill gas
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Addition of new components or extension/addition of technologies/measures that introduces:, Complementary technologies/measures
Applicable crediting period 16 Sep 21 - 15 Sep 28
Assessment opinion Assessment opinion (834 KB)
Revised PDD Revised PDD (2520 KB)   Revised PDD - track changes (2765 KB)
Supplementary documents
Signed form Signed form (181 KB)
DOE clarification DOE clarification 1 - 2022-11-17 City of CT PoA DD v24 track changes submitted.pdf (2764 KB)
DOE clarification 2 - 2022-11-17 City of CT PoA DD v24 clean submitted.pdf (2520 KB)
DOE clarification 3 - 996_PoA 10004 PRC FVR_track.pdf (607 KB)
DOE clarification 4 - 996_PoA 10004 PRC FVR_Clean.pdf (868 KB)
VVS version VVS-PoA 3.0
Current status 22 Dec 22 - Approved
Effective approval date: 21 Dec 22
Historic statuses 17 Oct 22 - Published
30 Oct 22 - Awaiting DOE clarifications
17 Nov 22 - DOE clarifications received
17 Nov 22 - Summary note being prepared
01 Dec 22 - Awaiting EB decision