Project: 9252 Broadlands Hydropower Project - Request for post-registration changes
Project 9252 Broadlands Hydropower Project
PRC ref PRC-9252-001
Process track Prior approval
DOE 4KES
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above

Change to the start date of the crediting period
  • Proposed start date of crediting period: 25 Dec 2020
Applicable crediting period 25 Dec 20 - 24 Dec 27
Assessment opinion Assessment opinion (368 KB)
Revised PDD Revised PDD (919 KB)   Revised PDD - track changes (970 KB)
Supplementary documents Appendix 1 - BHP EF and ER_Version 02, dated 09122020.xlsx (24 KB)
Appendix 2 - IRR Sheet_Broadlands Hydropowr Project Revised 12122020.xlsx (81 KB)
Signed form Signed form (141 KB)
DOE clarification DOE clarification 1 - UNFCCC Response 28012021.pdf (96 KB)
DOE clarification 2 - PDD BHP Revised PRC Clean 28012021.pdf (919 KB)
DOE clarification 3 - PDD BHP Revised PRC Track 28012021.pdf (970 KB)
DOE clarification 4 - PRC Validation Report 28.01.2021-Clean.pdf (368 KB)
DOE clarification 5 - PRC Validation Report 28.01.2021-Track.pdf (370 KB)
DOE clarification 6 - Reg_form17v8 - 28.01.2021.pdf (141 KB)
VVS version VVS-PA 2.0
Current status 19 Feb 21 - Approved
Effective approval date: 18 Feb 21
Historic statuses 11 Jan 21 - Published
15 Jan 21 - Awaiting DOE clarifications
28 Jan 21 - DOE clarifications received
28 Jan 21 - Summary note being prepared
29 Jan 21 - Awaiting EB decision