Project: 8046 24 MW wind power project in Tamil Nadu, India - Request for post-registration changes
Project 8046 24 MW wind power project in Tamil Nadu, India
PRC ref PRC-8046-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 23 Nov 12 - 22 Nov 22
Assessment opinion Assessment opinion (135 KB)
Revised PDD Revised PDD (530 KB)   Revised PDD - track changes (901 KB)
Supplementary documents
Signed form Signed form (79 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 18 Jul 23 - Approved
Effective approval date: 18 Jul 23
Historic statuses 19 Jun 23 - Request published