12:12 29 Dec 24
Project:
8046 24 MW wind power project in Tamil Nadu, India
- Request for post-registration changes
Project | 8046 24 MW wind power project in Tamil Nadu, India |
---|---|
PRC ref | PRC-8046-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 23 Nov 12 - 22 Nov 22 |
Assessment opinion | Assessment opinion (135 KB) |
Revised PDD | Revised PDD (530 KB) Revised PDD - track changes (901 KB) |
Supplementary documents | |
Signed form | Signed form (79 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 18 Jul 23 -
Approved
Effective approval date: 18 Jul 23
|
Historic statuses |
19 Jun 23 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: