Project:
9687 Grid connected electricity generation plant using natural gas at Jurong Island in Singapore
- Request for post-registration changes
Project | 9687 Grid connected electricity generation plant using natural gas at Jurong Island in Singapore |
---|---|
PRC ref | PRC-9687-001 |
Process track | Prior approval |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 14 Jul 14 - 13 Jul 21 |
Assessment opinion | Assessment opinion (161 KB) |
Revised PDD | Revised PDD (686 KB) Revised PDD - track changes (759 KB) |
Supplementary documents |
Appendix 1 - Emission_Reduction_Calcualtion_Revised.xlsx (38 KB)
|
Signed form | Signed form (51 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 11 May 20 -
Approved
Effective approval date: 10 May 20
|
Historic statuses |
06 Apr 20 -
Published 06 Apr 20 - Summary note being prepared 20 Apr 20 - Awaiting EB decision |