Project: 9687 Grid connected electricity generation plant using natural gas at Jurong Island in Singapore - Request for post-registration changes
Project 9687 Grid connected electricity generation plant using natural gas at Jurong Island in Singapore
PRC ref PRC-9687-001
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 14 Jul 14 - 13 Jul 21
Assessment opinion Assessment opinion (161 KB)
Revised PDD Revised PDD (686 KB)   Revised PDD - track changes (759 KB)
Supplementary documents Appendix 1 - Emission_Reduction_Calcualtion_Revised.xlsx (38 KB)
Signed form Signed form (51 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 11 May 20 - Approved
Effective approval date: 10 May 20
Historic statuses 06 Apr 20 - Published
06 Apr 20 - Summary note being prepared
20 Apr 20 - Awaiting EB decision