Project: 2652 Biogas project, BAJ Way Jepara - Request for post-registration changes
Project 2652 Biogas project, BAJ Way Jepara
PRC ref PRC-2652-002
Process track Issuance
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2013 - 31 Dec 2014

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 16 Sep 09 - 15 Sep 16
Assessment opinion Assessment opinion (171 KB)
Revised PDD Revised PDD (546 KB)   Revised PDD - track changes (554 KB)
Supplementary documents
Signed form Signed form (214 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Feb 15 - Approved
Effective approval date: 27 Feb 15
Historic statuses 29 Jan 15 - Request published