Project: 2596 Fujian Pingnan Jinzaoqiao Hydropower Project - Request for post-registration changes
Project 2596 Fujian Pingnan Jinzaoqiao Hydropower Project
PRC ref PRC-2596-001
Process track Issuance
DOE JCI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 22 Dec 09 - 21 Dec 16
Assessment opinion Assessment opinion (450 KB)
Revised PDD Revised PDD (583 KB)   Revised PDD - track changes (585 KB)
Supplementary documents
Signed form Signed form (122 KB)
DOE clarification
VVS version VVS 2.0
Current status 16 May 13 - Approved
Effective approval date: 16 May 13
Historic statuses 16 Apr 13 - Request published