Project: 4058 Kolar Biogas Project - Request for post-registration changes
Project 4058 Kolar Biogas Project
PRC ref PRC-4058-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Apr 2012 - 31 Mar 2013

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 01 Apr 12 - 31 Mar 22
Assessment opinion Assessment opinion (968 KB)
Revised PDD Revised PDD (2064 KB)   Revised PDD - track changes (1598 KB)
Supplementary documents Appendix 1 - 150618_ER Spreadsheet Kolar Project version 06.xlsx (414 KB)
Appendix 2 - 180615_KLR- ER Spreadsheet Ver.4.0_1st MR 367.xls (4058 KB)
Appendix 3 - 180615_KLR- ER Spreadsheet Ver.4.0_1st MR 264.xls (4346 KB)
Appendix 4 - 2015-07-02_Reliability test by DOE.xlsx (1269 KB)
Signed form Signed form (104 KB)
DOE clarification
VVS version VVS 7.0
Current status 01 Oct 15 - Approved
Effective approval date: 01 Oct 15
Historic statuses 18 Aug 15 - Published
18 Aug 15 - Summary note being prepared
10 Sep 15 - Awaiting EB decision