Project: 0851 Daegu Bangcheon-Ri Landfill Gas CDM Project - Request for post-registration changes
Project 0851 Daegu Bangcheon-Ri Landfill Gas CDM Project
PRC ref PRC-0851-001
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Apr 2010 - 18 Aug 2014

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 19 Aug 07 - 18 Aug 14
Assessment opinion Assessment opinion (338 KB)
Revised PDD Revised PDD (5604 KB)   Revised PDD - track changes (5620 KB)
Supplementary documents Appendix 1 - Appendix 2. Sample of Pressure daily report with,without flare.pdf (1101 KB)
Appendix 2 - Appendix 3. Sample of Daily Operation reports with flare.pdf (1038 KB)
Appendix 3 - Appendix 4. Sample of Daily Operation reports without flare.pdf (1825 KB)
Appendix 4 - Appendix 1 Evidence document of installed equipment specification.pdf (11 MB)
Signed form Signed form (400 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 May 16 - Approved
Effective approval date: 06 May 16
Historic statuses 06 Apr 16 - Request published