05:05 17 Nov 25
Project:
0851 Daegu Bangcheon-Ri Landfill Gas CDM Project
- Request for post-registration changes
| Project | 0851 Daegu Bangcheon-Ri Landfill Gas CDM Project |
|---|---|
| PRC ref | PRC-0851-001 |
| Process track | Issuance |
| DOE | DTSUS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
|
| Applicable crediting period | 19 Aug 07 - 18 Aug 14 |
| Assessment opinion |
Assessment opinion (338 KB)
|
| Revised PDD |
Revised PDD (5604 KB)
Revised PDD - track changes (5620 KB)
|
| Supplementary documents |
Appendix 1 - Appendix 2. Sample of Pressure daily report with,without flare.pdf (1101 KB)
Appendix 2 - Appendix 3. Sample of Daily Operation reports with flare.pdf (1038 KB)
Appendix 3 - Appendix 4. Sample of Daily Operation reports without flare.pdf (1825 KB)
Appendix 4 - Appendix 1 Evidence document of installed equipment specification.pdf (11 MB)
|
| Signed form |
Signed form (400 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 06 May 16 -
Approved
Effective approval date: 06 May 16
|
| Historic statuses |
06 Apr 16 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: