00:10 11 Jan 25
Project:
1264 Sandaowan Hydropower Project in Gansu Province, P.R. China
- Request for post-registration changes
Project | 1264 Sandaowan Hydropower Project in Gansu Province, P.R. China |
---|---|
PRC ref | PRC-1264-003 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 01 May 08 - 30 Apr 15 |
Assessment opinion | Assessment opinion (348 KB) |
Revised PDD | Revised PDD (324 KB) Revised PDD - track changes (325 KB) |
Supplementary documents |
Appendix 1 - 1264 Registered PDD.pdf (723 KB)
|
Signed form | Signed form (51 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 24 Jun 13 -
Approved
Effective approval date: 24 Jun 13
|
Historic statuses |
24 May 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: