Project: 6974 Grid connected renewable electricity generation project by SCCPL in Tamil Nadu, India - Request for post-registration changes
Project 6974 Grid connected renewable electricity generation project by SCCPL in Tamil Nadu, India
PRC ref PRC-6974-001
Process track Prior approval
DOE 4KES
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 14 Oct 2012 - 31 Dec 2020

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Decrease in the capacity, Removal or addition of sites
Applicable crediting period 14 Oct 12 - 13 Oct 22
Assessment opinion Assessment opinion (579 KB)
Revised PDD Revised PDD (1342 KB)   Revised PDD - track changes (1470 KB)
Supplementary documents Appendix 1 - 6974_ER_IRR.zip (21 MB)
Signed form Signed form (165 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 08 Mar 23 - Approved
Effective approval date: 07 Mar 23
Historic statuses 30 Jan 23 - Published
30 Jan 23 - Summary note being prepared
15 Feb 23 - Awaiting EB decision