Project:
6974 Grid connected renewable electricity generation project by SCCPL in Tamil Nadu, India
- Request for post-registration changes
Project | 6974 Grid connected renewable electricity generation project by SCCPL in Tamil Nadu, India |
---|---|
PRC ref | PRC-6974-001 |
Process track | Prior approval |
DOE | 4KES |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 14 Oct 12 - 13 Oct 22 |
Assessment opinion | Assessment opinion (579 KB) |
Revised PDD | Revised PDD (1342 KB) Revised PDD - track changes (1470 KB) |
Supplementary documents |
Appendix 1 - 6974_ER_IRR.zip (21 MB)
|
Signed form | Signed form (165 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 08 Mar 23 -
Approved
Effective approval date: 07 Mar 23
|
Historic statuses |
30 Jan 23 -
Published 30 Jan 23 - Summary note being prepared 15 Feb 23 - Awaiting EB decision |