Project: 3372 10 MW Wind Power Project at GSFC Limited - Request for post-registration changes
Project 3372 10 MW Wind Power Project at GSFC Limited
PRC ref PRC-3372-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 08 Jul 10 - 07 Jul 20
Assessment opinion Assessment opinion (65 KB)
Revised PDD Revised PDD (1613 KB)   Revised PDD - track changes (1814 KB)
Supplementary documents
Signed form Signed form (164 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 Jun 13 - Approved
Effective approval date: 06 Jun 13
Historic statuses 08 May 13 - Request published