Project:
3372 10 MW Wind Power Project at GSFC Limited
- Request for post-registration changes
Project | 3372 10 MW Wind Power Project at GSFC Limited |
---|---|
PRC ref | PRC-3372-001 |
Process track | Issuance |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 08 Jul 10 - 07 Jul 20 |
Assessment opinion | Assessment opinion (65 KB) |
Revised PDD | Revised PDD (1613 KB) Revised PDD - track changes (1814 KB) |
Supplementary documents | |
Signed form | Signed form (164 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 06 Jun 13 -
Approved
Effective approval date: 06 Jun 13
|
Historic statuses |
08 May 13 -
Request published |