Project: 9570 Bundled wind power project Cape Verde - Request for post-registration changes
Project 9570 Bundled wind power project Cape Verde
PRC ref PRC-9570-002
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 01 Apr 20 - 31 Mar 27
Assessment opinion Assessment opinion (434 KB)
Revised PDD Revised PDD (1303 KB)   Revised PDD - track changes (1309 KB)
Supplementary documents
Signed form Signed form (131 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 07 Mar 23 - Approved
Effective approval date: 07 Mar 23
Historic statuses 06 Feb 23 - Request published