Project: 2181 Methane Capture and On-site Power Generation Project at Syarikat Cahaya Muda Perak (Oil Mill) Sdn. Bhd. in Tapah, Perak, Malaysia - Request for post-registration changes
Project 2181 Methane Capture and On-site Power Generation Project at Syarikat Cahaya Muda Perak (Oil Mill) Sdn. Bhd. in Tapah, Perak, Malaysia
PRC ref PRC-2181-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 01 Jun 09 - 31 May 19
Assessment opinion Assessment opinion (487 KB)
Revised PDD Revised PDD (1203 KB)   Revised PDD - track changes (1239 KB)
Supplementary documents Appendix 1 - 2181 Financial Analysis.xls (352 KB)
Signed form Signed form (53 KB)
DOE clarification
VVS version VVS 2.0
Current status 17 Oct 13 - Approved
Effective approval date: 16 Oct 13
Historic statuses 03 Sep 13 - Published
17 Sep 13 - Awaiting DOE clarifications
19 Sep 13 - DOE clarifications received
19 Sep 13 - Summary note being prepared
25 Sep 13 - Awaiting EB decision