15:57 08 Jan 25
Project:
4777 Yuxian Dongdianziliang 49.5 MW Wind Power Project (Stage 1)
- Request for post-registration changes
Project | 4777 Yuxian Dongdianziliang 49.5 MW Wind Power Project (Stage 1) |
---|---|
PRC ref | PRC-4777-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Dec 11 - 30 Nov 18 |
Assessment opinion | Assessment opinion (474 KB) |
Revised PDD | Revised PDD (481 KB) Revised PDD - track changes (483 KB) |
Supplementary documents | |
Signed form | Signed form (110 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 20 Mar 13 -
Approved
Effective approval date: 20 Mar 13
|
Historic statuses |
19 Feb 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: