Project: 8371 Autoclaved Aerated Concrete blocks/panel manufacturing unit based on an energy efficient brick manufacturing technology - Request for post-registration changes
Project 8371 Autoclaved Aerated Concrete blocks/panel manufacturing unit based on an energy efficient brick manufacturing technology
PRC ref PRC-8371-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 30 Jun 14 - 29 Jun 24
Assessment opinion Assessment opinion (214 KB)
Revised PDD Revised PDD (2136 KB)   Revised PDD - track changes (2176 KB)
Supplementary documents
Signed form Signed form (116 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 06 Apr 23 - Approved
Effective approval date: 06 Apr 23
Historic statuses 08 Mar 23 - Request published