Project: 5401 Installation of wind power project in Rajasthan and Tamil Nadu - Request for post-registration changes
Project 5401 Installation of wind power project in Rajasthan and Tamil Nadu
PRC ref PRC-5401-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 Jan 12 - 09 Jan 22
Assessment opinion Assessment opinion (305 KB)
Revised PDD Revised PDD (647 KB)   Revised PDD - track changes (676 KB)
Supplementary documents
Signed form Signed form (126 KB)
DOE clarification
VVS version VVS 7.0
Current status 15 May 15 - Approved
Effective approval date: 15 May 15
Historic statuses 16 Apr 15 - Request published