Project: 5947 CTL Landfill Gas Project - Request for post-registration changes
Project 5947 CTL Landfill Gas Project
PRC ref PRC-5947-003
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 28 Apr 2017 - 28 Feb 2018

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Apr 13 - 31 Mar 20
Assessment opinion Assessment opinion (728 KB)
Revised PDD Revised PDD (2334 KB)   Revised PDD - track changes (2341 KB)
Supplementary documents
Signed form Signed form (148 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 21 Sep 18 - Approved
Effective approval date: 21 Sep 18
Historic statuses 23 Aug 18 - Request published