23:55 10 Jan 25
Project:
1410 Irani Wastewater Methane Avoidance Project
- Request for post-registration changes
Project | 1410 Irani Wastewater Methane Avoidance Project |
---|---|
PRC ref | PRC-1410-001 |
Process track | Prior approval |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 19 Jan 08 - 18 Jan 15 |
Assessment opinion | Assessment opinion (97 KB) |
Revised PDD | Revised PDD (715 KB) Revised PDD - track changes (856 KB) |
Supplementary documents | |
Signed form | Signed form (169 KB) |
DOE clarification |
DOE clarification 1 - Irani_PRC_updated per clarification request.pdf (97 KB)
|
VVS version | VVS 2.0 |
Current status | 03 Apr 13 -
Approved
Effective approval date: 02 Apr 13
|
Historic statuses |
29 Jan 13 -
Published 12 Feb 13 - Awaiting DOE clarifications 26 Feb 13 - DOE clarifications received 26 Feb 13 - Summary note being prepared 12 Mar 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: