Project: 1410 Irani Wastewater Methane Avoidance Project - Request for post-registration changes
Project 1410 Irani Wastewater Methane Avoidance Project
PRC ref PRC-1410-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 19 Jan 08 - 18 Jan 15
Assessment opinion Assessment opinion (97 KB)
Revised PDD Revised PDD (715 KB)   Revised PDD - track changes (856 KB)
Supplementary documents
Signed form Signed form (169 KB)
DOE clarification DOE clarification 1 - Irani_PRC_updated per clarification request.pdf (97 KB)
VVS version VVS 2.0
Current status 03 Apr 13 - Approved
Effective approval date: 02 Apr 13
Historic statuses 29 Jan 13 - Published
12 Feb 13 - Awaiting DOE clarifications
26 Feb 13 - DOE clarifications received
26 Feb 13 - Summary note being prepared
12 Mar 13 - Awaiting EB decision