09:14 04 Nov 25
			
			
      Project:
      1410 Irani Wastewater Methane Avoidance Project
      - Request for post-registration changes
    
					| Project | 1410 Irani Wastewater Methane Avoidance Project | 
|---|---|
| PRC ref | PRC-1410-001 | 
| Process track | Prior approval | 
| DOE | DNV | 
| 
          Methodology(ies) and/or Standardized Baseline(s) 
           applied at the post-registration changes  | 
        |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | 
          
            Permanent changes from the monitoring plan or the monitoring methodology
            
 Changes to the project or programme design 
  | 
      
| Applicable crediting period | 19 Jan 08 - 18 Jan 15 | 
| Assessment opinion | 
           Assessment opinion (97 KB)
         | 
      
| Revised PDD | 
           Revised PDD (715 KB)
           
           Revised PDD - track changes (856 KB)
         | 
      
| Supplementary documents | |
| Signed form | 
           Signed form (169 KB)
         | 
      
| DOE clarification | 
          
            
              
              
                 DOE clarification 1 - Irani_PRC_updated per clarification request.pdf (97 KB)
              
              
              
            
             | 
      
| VVS version | VVS 2.0 | 
| Current status | 03 Apr 13 -
                      Approved
             
              Effective approval date: 02 Apr 13
             
            
           | 
        
| Historic statuses | 
            
              
                
                29 Jan 13 -
                Published 12 Feb 13 - Awaiting DOE clarifications 26 Feb 13 - DOE clarifications received 26 Feb 13 - Summary note being prepared 12 Mar 13 - Awaiting EB decision  | 
        

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: