01:13 27 Oct 25
Project:
1040 Korat Waste To Energy
- Request for post-registration changes
| Project | 1040 Korat Waste To Energy |
|---|---|
| PRC ref | PRC-1040-002 |
| Process track | Prior approval |
| DOE | PJRCES |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (88 KB)
|
| Revised PDD | |
| Supplementary documents |
Appendix 1 - Korat 3rd_Conservative Dataof Biogas NCVv01.pdf (65 KB)
|
| Signed form |
Signed form (450 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 30 Sep 13 -
Approved
Effective approval date: 30 Sep 13
|
| Historic statuses |
27 Aug 13 -
Published 27 Aug 13 - Summary note being prepared 10 Sep 13 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: