Project: 3391 Shandong Huaneng Shouguang 49.5MW Wind Farm Project - Request for post-registration changes
Project 3391 Shandong Huaneng Shouguang 49.5MW Wind Farm Project
PRC ref PRC-3391-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 19 Jul 10 - 18 Jul 17
Assessment opinion Assessment opinion (148 KB)
Revised PDD Revised PDD (341 KB)   Revised PDD - track changes (419 KB)
Supplementary documents
Signed form Signed form (108 KB)
DOE clarification
VVS version VVS 2.0
Current status 23 May 13 - Approved
Effective approval date: 23 May 13
Historic statuses 24 Apr 13 - Request published