23:21 31 Oct 25
			
			
      Project:
      3391 Shandong Huaneng Shouguang 49.5MW Wind Farm Project
      - Request for post-registration changes
    
					| Project | 3391 Shandong Huaneng Shouguang 49.5MW Wind Farm Project | 
|---|---|
| PRC ref | PRC-3391-001 | 
| Process track | Issuance | 
| DOE | BVI | 
| Methodology(ies) and/or Standardized Baseline(s) applied at the post-registration changes | |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | Corrections that do not affect project design 
 Permanent changes from the monitoring plan or the monitoring methodology 
 | 
| Applicable crediting period | 19 Jul 10 - 18 Jul 17 | 
| Assessment opinion |  Assessment opinion (148 KB) | 
| Revised PDD |  Revised PDD (341 KB)  Revised PDD - track changes (419 KB) | 
| Supplementary documents | |
| Signed form |  Signed form (108 KB) | 
| DOE clarification | |
| VVS version | VVS 2.0 | 
| Current status | 23 May 13 -
                      Approved 
              Effective approval date: 23 May 13
             | 
| Historic statuses | 24 Apr 13 -
                Request published | 

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: