05:36 02 Jan 26
Project:
3391 Shandong Huaneng Shouguang 49.5MW Wind Farm Project
- Request for post-registration changes
| Project | 3391 Shandong Huaneng Shouguang 49.5MW Wind Farm Project |
|---|---|
| PRC ref | PRC-3391-001 |
| Process track | Issuance |
| DOE | BVI |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 19 Jul 10 - 18 Jul 17 |
| Assessment opinion |
Assessment opinion (148 KB)
|
| Revised PDD |
Revised PDD (341 KB)
Revised PDD - track changes (419 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (108 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 23 May 13 -
Approved
Effective approval date: 23 May 13
|
| Historic statuses |
24 Apr 13 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: