Project: 2640 VN08-WWS-05, Methane Recovery and Biogas Utilization Project, Quang Tri Province, Vietnam - Request for post-registration changes
Project 2640 VN08-WWS-05, Methane Recovery and Biogas Utilization Project, Quang Tri Province, Vietnam
PRC ref PRC-2640-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 21 Dec 10 - 20 Dec 17
Assessment opinion Assessment opinion (154 KB)
Revised PDD Revised PDD (683 KB)   Revised PDD - track changes (722 KB)
Supplementary documents
Signed form Signed form (111 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Feb 14 - Approved
Effective approval date: 18 Feb 14
Historic statuses 14 Jan 14 - Published
14 Jan 14 - Summary note being prepared
28 Jan 14 - Awaiting EB decision