02:47 04 Jan 25
Project:
6526 Hubei Duhe Pankou Hydropower Plant
- Request for post-registration changes
Project | 6526 Hubei Duhe Pankou Hydropower Plant |
---|---|
PRC ref | PRC-6526-001 |
Process track | Issuance |
DOE | CTI Certification |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 01 Jan 13 - 31 Dec 19 |
Assessment opinion | Assessment opinion (149 KB) |
Revised PDD | Revised PDD (1038 KB) Revised PDD - track changes (967 KB) |
Supplementary documents |
Appendix 1 - IRR spreadsheet for the revised PDD and PRC.xls (99 KB)
Appendix 2 - ER Calculation-updated for PRC.xlsx (13 KB) |
Signed form | Signed form (224 KB) |
DOE clarification | |
Current status | 02 Apr 15 -
Approved
Effective approval date: 02 Apr 15
|
Historic statuses |
04 Mar 15 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: