Project:
6526 Hubei Duhe Pankou Hydropower Plant
- Request for post-registration changes
| Project | 6526 Hubei Duhe Pankou Hydropower Plant |
|---|---|
| PRC ref | PRC-6526-001 |
| Process track | Issuance |
| DOE | CTI Certification |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 01 Jan 13 - 31 Dec 19 |
| Assessment opinion |
Assessment opinion (149 KB)
|
| Revised PDD |
Revised PDD (1038 KB)
Revised PDD - track changes (967 KB)
|
| Supplementary documents |
Appendix 1 - IRR spreadsheet for the revised PDD and PRC.xls (99 KB)
Appendix 2 - ER Calculation-updated for PRC.xlsx (13 KB)
|
| Signed form |
Signed form (224 KB)
|
| DOE clarification | |
| Current status | 02 Apr 15 -
Approved
Effective approval date: 02 Apr 15
|
| Historic statuses |
04 Mar 15 -
Request published |

Assessment opinion
Appendix 1 - IRR spreadsheet for the revised PDD and PRC.xls
Offset now: visit the United Nations Carbon Offset Platform