Project: 6447 Zhejiang Tangcun 32MW Hydropower Project - Request for post-registration changes
Project 6447 Zhejiang Tangcun 32MW Hydropower Project
PRC ref PRC-6447-003
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2015 - 31 Dec 2015

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 20 Jun 12 - 19 Jun 19
Assessment opinion Assessment opinion (194 KB)
Revised PDD Revised PDD (1608 KB)   Revised PDD - track changes (1720 KB)
Supplementary documents
Signed form Signed form (302 KB)
DOE clarification
VVS version VVS 2.0
Current status 02 Dec 16 - Approved
Effective approval date: 02 Dec 16
Historic statuses 03 Nov 16 - Request published