Project:
6447 Zhejiang Tangcun 32MW Hydropower Project
- Request for post-registration changes
| Project | 6447 Zhejiang Tangcun 32MW Hydropower Project |
|---|---|
| PRC ref | PRC-6447-003 |
| Process track | Issuance |
| DOE | RINA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 20 Jun 12 - 19 Jun 19 |
| Assessment opinion |
Assessment opinion (194 KB)
|
| Revised PDD |
Revised PDD (1608 KB)
Revised PDD - track changes (1720 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (302 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 02 Dec 16 -
Approved
Effective approval date: 02 Dec 16
|