Project:
3072 Hunan Yiyang Kaidi Biomass Power Project
- Request for post-registration changes
| Project | 3072 Hunan Yiyang Kaidi Biomass Power Project |
|---|---|
| PRC ref | PRC-3072-001 |
| Process track | Issuance |
| DOE | CEC |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 01 Jan 11 - 31 Dec 17 |
| Assessment opinion |
Assessment opinion (187 KB)
|
| Revised PDD |
Revised PDD (1288 KB)
Revised PDD - track changes (1339 KB)
|
| Supplementary documents |
Appendix 1 - ER-calculation (HunanYiyangKaidi).xls (37 KB)
|
| Signed form |
Signed form (199 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 16 Sep 13 -
Approved
Effective approval date: 16 Sep 13
|
| Historic statuses |
16 Aug 13 -
Request published |

Assessment opinion
Appendix 1 - ER-calculation (HunanYiyangKaidi).xls