Project: 1176 PT. BUDI ACID JAYA Tapioca Starch Production Facilities Effluent Methane Extraction And On-site Power Generation Project in Lampung Province, Republic of Indonesia - Request for post-registration changes
Project 1176 PT. BUDI ACID JAYA Tapioca Starch Production Facilities Effluent Methane Extraction And On-site Power Generation Project in Lampung Province, Republic of Indonesia
PRC ref PRC-1176-001
Process track Prior approval
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 02 Nov 2008 - 31 Dec 2013

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 02 Nov 08 - 01 Nov 15
Assessment opinion Assessment opinion (1253 KB)
Revised PDD Revised PDD (650 KB)   Revised PDD - track changes (1161 KB)
Supplementary documents
Signed form Signed form (193 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Sep 13 - Approved
Effective approval date: 23 Sep 13
Historic statuses 20 Aug 13 - Published
20 Aug 13 - Summary note being prepared
02 Sep 13 - Awaiting EB decision