20:30 23 Dec 24
Project:
7576 Amakhala Emoyeni Grid Connected 138.6 MW Wind Farm, Phase 1, South Africa
- Request for post-registration changes
Project | 7576 Amakhala Emoyeni Grid Connected 138.6 MW Wind Farm, Phase 1, South Africa |
---|---|
PRC ref | PRC-7576-001 |
Process track | Prior approval |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 01 Oct 16 - 30 Sep 26 |
Assessment opinion | Assessment opinion (1012 KB) |
Revised PDD | Revised PDD (1730 KB) Revised PDD - track changes (1835 KB) |
Supplementary documents |
Appendix 1 - 4. Amakhala Wind_ER calculation__27.01.2014_to the DOE.zip (8472 bytes)
|
Signed form | Signed form (102 KB) |
DOE clarification |
DOE clarification 1 - 1. CCL 218_VALR PRC VVS - 13052014 (Clean).pdf (977 KB)
DOE clarification 2 - 1. CCL 218_VALR PRC VVS - 13052014 (track changes).pdf (988 KB) |
VVS version | VVS 2.0 |
Current status | 13 Jun 14 -
Approved
Effective approval date: 12 Jun 14
|
Historic statuses |
29 Apr 14 -
Published 13 May 14 - Awaiting DOE clarifications 13 May 14 - DOE clarifications received 13 May 14 - Summary note being prepared 22 May 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: