Project: 7576 Amakhala Emoyeni Grid Connected 138.6 MW Wind Farm, Phase 1, South Africa - Request for post-registration changes
Project 7576 Amakhala Emoyeni Grid Connected 138.6 MW Wind Farm, Phase 1, South Africa
PRC ref PRC-7576-001
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Oct 16 - 30 Sep 26
Assessment opinion Assessment opinion (1012 KB)
Revised PDD Revised PDD (1730 KB)   Revised PDD - track changes (1835 KB)
Supplementary documents Appendix 1 - 4. Amakhala Wind_ER calculation__27.01.2014_to the DOE.zip (8472 bytes)
Signed form Signed form (102 KB)
DOE clarification DOE clarification 1 - 1. CCL 218_VALR PRC VVS - 13052014 (Clean).pdf (977 KB)
DOE clarification 2 - 1. CCL 218_VALR PRC VVS - 13052014 (track changes).pdf (988 KB)
VVS version VVS 2.0
Current status 13 Jun 14 - Approved
Effective approval date: 12 Jun 14
Historic statuses 29 Apr 14 - Published
13 May 14 - Awaiting DOE clarifications
13 May 14 - DOE clarifications received
13 May 14 - Summary note being prepared
22 May 14 - Awaiting EB decision