23:40 10 Nov 25
Project:
6401 Biomass based Co-generation plant at Birlagram, Nagda, Madhya Pradesh, India.
- Request for post-registration changes
| Project | 6401 Biomass based Co-generation plant at Birlagram, Nagda, Madhya Pradesh, India. |
|---|---|
| PRC ref | PRC-6401-001 |
| Process track | Prior approval |
| DOE | 4KES |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 03 Sep 12 - 02 Sep 22 |
| Assessment opinion |
Assessment opinion (349 KB)
|
| Revised PDD |
Revised PDD (1133 KB)
Revised PDD - track changes (1568 KB)
|
| Supplementary documents |
Appendix 1 - Levelized cost analysis - LIPL- Revised PRC.xls (264 KB)
Appendix 2 - Emission Reductions - LIPL-PRC.xls (84 KB)
|
| Signed form |
Signed form (160 KB)
|
| DOE clarification |
DOE clarification 1 - Clarification Request_PRC-6401-001.pdf (134 KB)
|
| VVS version | VVS-PA 3.0 |
| Current status | 15 Jun 22 -
Approved
Effective approval date: 12 Jun 22
|
| Historic statuses |
19 Apr 22 -
Published 29 Apr 22 - Awaiting DOE clarifications 09 May 22 - DOE clarifications received 09 May 22 - Summary note being prepared 23 May 22 - Awaiting EB decision |

Assessment opinion
Appendix 1 - Levelized cost analysis - LIPL- Revised PRC.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: