Project: 1040 Korat Waste To Energy - Request for post-registration changes
Project 1040 Korat Waste To Energy
PRC ref PRC-1040-001
Process track Prior approval
DOE PJRCES
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 17 Jun 2007 - 25 Jul 2009
Assessment opinion Assessment opinion (88 KB)
Revised PDD  
Supplementary documents Appendix 1 - 2nd Conservative Dataof Biogas NCVv01.pdf (67 KB)
Signed form Signed form (450 KB)
DOE clarification
VVS version VVS 2.0
Current status 08 Oct 13 - Approved
Effective approval date: 01 Oct 13
Historic statuses 27 Aug 13 - Published
27 Aug 13 - Summary note being prepared
10 Sep 13 - Awaiting EB decision