Project: 10285 Ethiopia Off-Grid Renewable Energy Program - Request for post-registration changes
Project 10285 Ethiopia Off-Grid Renewable Energy Program
PRC ref PRC-10285-002
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD
Applicable crediting period 01 Jul 16 - 30 Jun 23
Assessment opinion Assessment opinion (598 KB)
Revised PDD Revised PDD (679 KB)   Revised PDD - track changes (737 KB)
Supplementary documents Appendix 1 - 2018-12-17 RfIss_PoA10285-MP1-IRP1 - incomplete submission.msg (71 KB)
Appendix 2 - Off-Grid CPA 1_Appendix 4_Emission Reduction Calculation_Final V18_PRC.xls (50 KB)
Signed form Signed form (49 KB)
DOE clarification DOE clarification 1 - 2019-01-14_CPA_PRC_Assessment Report_ver1.1.pdf (601 KB)
DOE clarification 2 - 2019-01-14_Response summary.pdf (162 KB)
VVS version VVS-PA 1.0
Current status 04 Feb 19 - Approved
Effective approval date: 03 Feb 19
Historic statuses 07 Jan 19 - Published
10 Jan 19 - Awaiting DOE clarifications
14 Jan 19 - DOE clarifications received
14 Jan 19 - Summary note being prepared
14 Jan 19 - Awaiting EB decision