4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW
- Request for post-registration changes
| Project | 4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW |
|---|---|
| PRC ref | PRC-4118-005 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Mar 11 - 28 Feb 18 |
| Assessment opinion |
Assessment opinion (295 KB)
|
| Revised PDD |
Revised PDD (2843 KB)
Revised PDD - track changes (2903 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (152 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 07 Dec 21 -
Approved
Effective approval date: 07 Dec 21
|