Project: 4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW - Request for post-registration changes
Project 4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW
PRC ref PRC-4118-005
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Mar 11 - 28 Feb 18
Assessment opinion Assessment opinion (295 KB)
Revised PDD Revised PDD (2843 KB)   Revised PDD - track changes (2903 KB)
Supplementary documents
Signed form Signed form (152 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 07 Dec 21 - Approved
Effective approval date: 07 Dec 21
Historic statuses 08 Nov 21 - Request published