Project: 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa - Request for post-registration changes
Project 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa
PRC ref PRC-4728-003
Process track Prior approval
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 May 2013 - 30 Jun 2018

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 01 Jul 11 - 30 Jun 18
Assessment opinion Assessment opinion (654 KB)
Revised PDD Revised PDD (4908 KB)   Revised PDD - track changes (5104 KB)
Supplementary documents Appendix 1 - CDM_PRCW_FORM_4728.pdf (172 KB)
Signed form Signed form (482 KB)
DOE clarification DOE clarification 1 - PRC request form resubmission 24022020.pdf (243 KB)
DOE clarification 2 - Beatrix Emission Calcs MPIII v3.zip (147 MB)

VVS version VVS-PA 2.0
Current status 11 May 20 - Withdrawn
Effective approval date: 07 May 20
Historic statuses 27 Jan 20 - Published
10 Feb 20 - Awaiting DOE clarifications
24 Feb 20 - DOE clarifications received
24 Feb 20 - Summary note being prepared