Project: 5927 Promotion of Energy-Efficient lighting using Compact Fluorescent Light Bulbs in rural areas in Senegal - Request for post-registration changes
Project 5927 Promotion of Energy-Efficient lighting using Compact Fluorescent Light Bulbs in rural areas in Senegal
PRC ref PRC-5927-002
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Use of positive lists or related provisions is introduced or modified based on the valid version of approved tools pertaining to demonstration of additionality of small-scale or microscale project activities, A revision to the eligibility criteria pertaining to the demonstration of additionality
Applicable crediting period 10 Oct 12 - 09 Oct 19
Assessment opinion Assessment opinion (448 KB)
Revised PDD Revised PDD (1071 KB)   Revised PDD - track changes (1619 KB)
Supplementary documents
Signed form Signed form (167 KB)
DOE clarification DOE clarification 1 - AENOR response Request for clarifications.pdf (125 KB)
DOE clarification 2 - PoA-DD v.18 - ASERCF - PRC revised_Track_Changes.pdf (1338 KB)
DOE clarification 3 - PoA-DD v.18 - ASERCF - PRC_CLEAN.PDF (1164 KB)
DOE clarification 4 - Validation Report PRC Senegal CFLs PoAv3_clean version.pdf (483 KB)
DOE clarification 5 - Validation Report PRC Senegal CFLs PoAv3_tracked changes.pdf (491 KB)
DOE clarification 6 - CDM-PRC-FORM_v2_clean version.pdf (483 KB)
DOE clarification 7 - CDM-PRC-FORM_v2-tracked changes.pdf (491 KB)
VVS version VVS-PoA 1.0
Current status 29 Oct 18 - Approved
Effective approval date: 28 Oct 18
Historic statuses 03 Sep 18 - Published
15 Sep 18 - Awaiting DOE clarifications
27 Sep 18 - DOE clarifications received
27 Sep 18 - Summary note being prepared
08 Oct 18 - Awaiting EB decision