Project: 6488 Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia - Request for post-registration changes
Project 6488 Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia
PRC ref PRC-6488-002
Process track Issuance
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 24 Jun 2016 - 31 Dec 2019
Assessment opinion Assessment opinion (773 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (2698 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 08 Mar 21 - Approved
Effective approval date: 08 Mar 21
Historic statuses 05 Feb 21 - Request published